EA series is an loading and unloading system with fully automatic operation.It is designed for medium and thine metal sheets.And it has the advantages of higher safety and efficiency. If you need to process thin or medium-thickness metal sheets, this automatic loading and unloading machine is an ideal choice. Besides, it has the advantages of fast speed, high flexibility, high efficiency, high precision, and no pollution. Its products are widely used in construction machinery, machine tools, various metal products, sheet metal cutting and processing industries.
Features
(1)Overall lightweight design, the split modular design greatly reduces the installation time and transportation cost.
(2)Save factory storage space: compact vertical design(upper layer is for stack of finished products, bottom layer for material pallet)
Separate loading vacuum sucker and unloading fork device: more stable working than integrated design .
(3)Material easy access: common materials are stored directly next to the machine and are immediately accessible
(4)High efficiency: the exchange table automatically loads and unloads, which significantly improves the utilization rate of the entire system.
(5)Unattended processing under very high degree . Extremely flexible and simple to operate: the forklift easily places the raw material into the storage system or removes the processed sheet from the stack.Support automatic loading and unloading of up to 25 mm thick plates of various sizes.
Technical Parameters
Model |
DXTECH-3015EA |
DXTECH-4020EA |
DXTECH-6020EA |
Laser |
Multiple options |
Multiple options |
Multiple options |
Min. Thickness of Sheet Loaded |
1mm |
1mm |
1mm |
Max. Thickness of Sheet Loaded |
5mm |
5mm |
5mm |
Max. Weight of Sheet Loaded |
400kg |
400kg |
400kg |
Focusing method |
Auto/manual |
Auto/manual |
Auto/manual |
Power |
1-4KW |
1-4KW |
1-4KW |
Maximum acceleration |
1.5G |
1.5G |
1.5G |
Maximum linkage speed |
150M/min |
150M/min |
150M/min |
Circuit breaker |
Schneider |
Schneider |
Schneider |
Premium Product Components
Aviation aluminum beam
1) It has the characteristics of corrosion resistance, lightweight and high rigidity, which ensure the high-speed movement during laser processing.
2) It has perfect dynamic performance, such as anti-twisting, anti-tilting, and
resistance to deformation, etc., to ensure higher cutting accuracy.
Smart Focus Laser Head
1) Heat dissipation: Both collimating mirror and focusing mirror set are heat dissipation accessories.
2) Cooling airflow nozzles are added to effectively protect the nozzles and ceramics and extend the working time.
3) Tracking aperture: By 35mm aperture, the interference of stray light is effectively reduced.
4) Auto-focusing: free from human interference, focusing speed up to 10m/min and repeat accuracy about 50 microns.
Automatic loading and unloading system
1) The whole line can realize fully automatic and intelligent operation to ensure that the production process is unattended. 2) Equipped with raw material trays and finished material trays, which can realize automatic transfer back to the warehouse and meet the needs of small, medium, large, and varieties of plates.
Samples Display
Application
Why choose DXTECH?
FAQ
1. Do you have the CE document and other documents for customs clearance?
A: Yes, we have the Original. At first, we will show you and after shipment, we will give you CE/Packing list/Commercial
Invoice/Sales contract for customs clearance.
2. Payment terms?
A: Alibaba trade assurance/TT/West Union/Paypal/LC/Cash and so on.
3. What's the max. cutting thickness?
A: Cutting thickness is related to laser power.Note: only 1KW or above fiber laser could cut Aluminum, Copper, Brass, and other high-reflection sheet metal.
4. Which kind of materials can be processed on this machine?
A: Wood, MDF, stone, acrylic, glass, plastic, foam, aluminum, copper, and almost all kinds of non-steel materials.
5. How long is the delivery time?
A: For standard machines, it will be 7-10 days; For non-standard machines and customized machines according to the client's specific requirements, it will be 15 to 30 days.